COCA-COLA PRODUCTION PLANT
1995/1996, TIRANA - ALBANIA

COCA-COLA PRODUCTION PLANT

1995/1996, TIRANA - ALBANIA
Industrial building for the production of Coca-Cola. The construction system used is the ONDAL one, designed and patented by DLC S.r.l. The main feature of this building is that it has been entirely produced in Italy and the elements were first transported by boat and then assembled on site.
2018 © DLC consulting srl
Via teocrito, 47 - 20128 Milano | + 39 02 252071 | info@dlc-consulting.it